Digging the trench
Date: 03/16/2007
Views: 218
|
Trench dirt used for fill
Date: 03/16/2007
Views: 172
|
Retaining wall extension
Date: 03/16/2007
Views: 123
|
9 cubic yards of rich topsoil
Date: 03/17/2007
Views: 133
|
|
First load of topsoil and retaining wall extension.
Date: 03/17/2007
Views: 190
|
Bottom of the trench
Date: 03/17/2007
Views: 126
|
Middle section of the trench
Date: 03/17/2007
Views: 144
|
7 yards of river rock gravel and 9 yards of Brazos cobble stone
Date: 03/17/2007
Views: 228
|
|
Extended S cut into the right side of the trench
Date: 03/17/2007
Views: 210
|
River rock gravel and Brazos cobble stone
Date: 03/17/2007
Views: 170
|
Two loads of topsoil ready to be spread
Date: 03/17/2007
Views: 132
|
Two pallets of mossy sandstone for creating tree border rings
Date: 03/19/2007
Views: 130
|
|
The topsoil has been spread
Date: 03/19/2007
Views: 149
|
Dry creek bed from the top
Date: 03/19/2007
Views: 452
|
|
|